April 7, 1-4:30PM

Performance Testing Workshop

Using Tools to Measure Performance and Best Practices

https://pixotech.com

image

About us

image

Steve Zazeski @sztech

  • Alumni of UIUC Computer Engineering
  • Started as a student worker in College of ACES - Extension, now downtown Urbana at Pixo across the street from Crane Alley
  • Truly enjoy getting to work on the range from microcontrollers (ESP32/arduino) to cloud scale k8s clusters
image

Jason Rambeck

I've been building websites since 2002 and still loving it. At Pixo I am a lead web developer working primarily on content management systems and websites -
especially WordPress.

image

hold on to your butts meme width:800px

image

Why performance matters

image

Internet Speeds in the US

width:1000px

image

Netflix Speeds

image

image

Mobile Speeds are increasing

width:1000px

image

Future 5G

width:1000px

image

Mobile Speed and Pageload Increases

width:1000px

image

https://almanac.httparchive.org/en/2020/performance
width:1000px

image

User experience

Users studies have shown that page speed is the number one factor in user experience.

width:700px

Source: SPEED MATTERS

image

Bounce rate

image

Source: Google

image

Fast websites build trust

— Yesenia Perez Cruz [Youtube]

image

What is performance?

  • It is not as simple as how many seconds it takes for a page to load.
  • There are a number of other milestones we can measure on the way to a complete page load that help define performance.
  • It is relative: What the user wants to do, what their connection speed is, the power of their device.
  • New visitors and repeat visitors have a different experience.
image

Web Vitals

Google created a set of Web Vitals that help us think about (and measure) unique facets of performance experience.

image

Core Web Vitals

Core Web Vitals are a subset of these metrics they have determined are the most meaningful.

width:1000px

image

Largest Contentful Paint

Measures the time until the page displays what is likely its main content, like a hero image or heading

image

width:800px
width:800px

image

First Input Delay

measures the interactivity of the page, from the user's first interaction to the time the page responds to it.
Field only metric (not in Lighthouse)

image

width:1000px

image

Cumulative Layout Shift

measures the degree of layout instability on the page, due to shifts like asynchronously loaded content being injected

image
image

Other Web Vitals

image

Speed Index (SI)

Measures how quickly content is visually displayed during page load. Lighthouse first captures a video of the page loading in the browser and computes the visual progression between frames.

image

width:1000px

image

First Contentful paint (FCP)

Measures the time from when the page starts loading to when any part of the page's content is rendered on the screen.

image

width:1000px

image

Time to Interactive (TTI)

Measures the time from when the page starts loading to when it's visually rendered, its initial scripts (if any) have loaded, and it's capable of reliably responding to user input quickly.

image

width:1000px

image

Total Blocking Time (TBT)

Measures the total amount of time between FCP and TTI where the main thread was blocked for long enough to prevent input responsiveness.

width:1000px

image

Lighthouse

image

There are multiple ways to use Lighthouse.

image

Google Pagespeed Insights (PSI)

image

Upside

  • Very easy
  • Includes "field data" (limited available data)
  • API - Can use this as a service to automate or build an application.

Downside

  • No easy way to export
  • No "settings"
  • Website must be public
image

Field data vs. Lab data

Field data: The Chrome User Experience Report is powered by real user measurement of key user experience metrics across the public web, aggregated from users who have opted-in to syncing their browsing history, have not set up a Sync passphrase, and have usage statistic reporting enabled.

image

width:700px

image

Demo PSI

image

cnn.com - Mobile

width:1000px

image

bestbuy.com - Desktop

width:1000px

image

bestbuy.com - Mobile

width:1000px

image

Space Jam website

https://www.spacejam.com/1996/

width:1000px

image

Chrome DevTools

  • Very easy
  • Lots of settings available
  • Affected by your computing power and internet connection
  • Affected by your browser configuration and extensions
image

Demo in DevTools

image

Read the tips during a run

width:1000px

image

ahaslides.com/WEBCON

Find the fastest desktop sites you can find

webcon.illinois.com 99

image

ahaslides.com/WEBCON

Find the slowest desktop sites you can find

cnn.com 7

image

Best Results

Worse Results

image

Lighthouse command line tool

  • Free of browser extensions
  • Lots of settings available
  • Scripting and automation
  • Affected by your computing power and internet connection
image

Demo CLI

npm install -g lighthouse
lighthouse https://bestbuy.com --view
image

DevTools: Network Tab

  • The waterfall
  • The filmstrip
  • Page size
  • Request count
  • DOMContentLoaded (Node tree)
  • Load (images, assets)
  • Finish (async requests)

DEMO

image

DevTools: Performance profile

  • Frames
  • Web Vitals timeline
  • Timings
  • Experience

DEMO

image

Throttling

image

Performance goals

Good performance is contextual. So set goals based on those contexts.

  1. See content
  2. Click a thing
image

Performance budgets

lighthouse --budget-path budget-sample.json https://pixotech.com

  • Lighthouse can run an audit against your goals and show when you are making too many requests or too large of files in categories.
  • There is no one set budget, but recommend always setting one
  • Download our sample budget with all options on github.com
  • can only be used with cli or ci version
image

Auditing your site

Download the performance audit worksheet.

image

"We can’t let best be the enemy of better code."

— Michael Feathers - Working Effectively With Legacy Code

image

Don't chase a perfect 100 score

width:800px

  • Perfect 100 might be fast, but is it useful
  • Metrics are changing, internet is changing, devices are changing
image

Balance of Performance

App Single Request <-> Few Large Requests <-> Lots Small Requests

  • How fast does your site update?
  • What connection does your user have?
image

There is no one best,

most performant website

it depends on your use case

image

Waterfall View

width:1000px

image

Ideal Waterfall*

Single Request

width:1000px

image

Real Ideal Waterfall

width:1000px

image

width:400px

image

Activity : Test our site

What happens to this site?
https://poor-performance.pixodev.net/lots-of-images/

image

Activity

Test your site with Network tab waterfall

  • Is your main html page fast?
  • How many tiers of loads do you have?
  • What is/are your slow resources?
image

Number of Concurrent Connections

Number of seperate resources that need to be loaded matters.

  • Chrome 89 == 6
  • Firefox 68 == 9
  • Edge 18 == 12
image

Server Default Concurrent Connections

  • Apache == 150
  • nginx == 512
  • iis == 5000

Without load testing and tuning, these numbers are just limits

image

width:250px

  • is a simple command line tool to place load on a webserver
  • Be careful running the default settings
    • hey https://poor-performance.pixodev.net 50/s for 250 requests
    • hey -n 5000 -c 10 https://poor-performance.pixodev.net 10 requests per second for 5000 total requests
    • hey -z 10m -c 5 https://poor-performance.pixodev.net runs for 10m with 5 requests per second
image

Slashdot Effect / Viral Links

image

image

Reverse Proxy Cache

image

nginx

  • Created in 2002 to solve the C10k issue for Rambler search engine
  • Designed to outperform Apache, not as flexible
  • Uses a different paradigm to avoid fork bombing and uses much less memory
  • Its more difficult to setup, lots of docker containers just have apache
  • Alot of its default settings have performance in mind, its just newer
image

Generates modern best practice config:
nginxconfig.io

image

Common Lighthouse Issues

  • HTTP/2

  • Serve static assets with an efficient cache policy

  • Properly size images

  • Image elements do not have explicit width and height

  • Avoid enormous network payloads

  • Minimize main-thread work

image

image
https://news.netcraft.com/archives/category/web-server-survey/

image

HTTP/2

  • introduced May 2015, support added in Chrome 51
  • Tries to fix the concept of multiple separate connections to the same server by opening a stream and pushing multiple requests through it.
image

width:700px

image

Enable HTTP/2

image

HTTP/3

  • Introduced Feb 2021
  • Replaces TCP for QUIC (pronounced QUICK) which is roughly a modified UDP
  • TCP doesn't like out of order packet
  • 14% of web servers, 7% of desktops, 0% of mobile support it (April 2021)
  • (Chrome 79*, firefox 72*, safari 14)
image

Gzip / Brotli

  • Module for Apache/nginx that compresses files in transit (mostly html, css, and js) during the transfer

  • gzip 78%, brotli 82% savings over uncompressed text

  • mod_deflate or mod_gzip or mod_brotli

image

https://tools.keycdn.com/brotli-test

width:700px

image

Efficient cache policy

  • Add headers Cache-Control: max-age=31536000 public
  • Apache or Nginx create or edit the root .htaccess
<FilesMatch ".(gif|jpg|jpeg|png|ico)$">
   Header set Cache-Control "max-age=#####"
</FilesMatch>
  • 86400 = 1 day, 2419200 = 1 month, 29030400 = 1 year
image

Cache-Control Headers

public

The response may be stored in any cache

private

The response may be stored only in the browser's cache

image

Cache-Control Headers

no-cache

The response may be stored by any cache, even if the response is normally non-cacheable. However, the stored response MUST always go through validation with the origin server first before using it.

no-store

The response may not be stored in any cache. Note that this will not prevent a valid pre-existing cached response being returned. Clients can set max-age=0

image

Etag

  • Check the file hash to see if it has changed from the cached version
  • Most servers automatically add etag for you to static assets
  • 304 Not Modified
  • etag: "2d9d-5a31a59c7b011-gzip"
image

"There are two hard things in computer science: cache invalidation, naming things, and off-by-one errors."

— @codinghorror

image

Apache Cache with mod_expires

<IfModule mod_expires.c>
    ExpiresActive On
    ExpiresByType image/jpeg "access plus 1 year"
    ExpiresByType image/gif "access plus 1 year"
    ExpiresByType image/png "access plus 1 year"
    ExpiresByType image/webp "access plus 1 year"
    ExpiresByType image/svg+xml "access plus 1 year"
    ExpiresByType image/x-icon "access plus 1 year"
    ExpiresByType video/mp4 "access plus 1 year"
    ExpiresByType video/mpeg "access plus 1 year"
    ExpiresByType text/css "access plus 1 week"
    ExpiresByType text/javascript "access plus 1 month"
    ExpiresByType application/javascript "access plus 1 month"
    ExpiresByType application/pdf "access plus 1 month"
</IfModule>
image

Apache Cache with mod_headers

<ifModule mod_headers.c> 
    # One year for image and video files
    <filesMatch ".(flv|gif|ico|jpg|jpeg|mp4|mpeg|png|svg|swf|webp)$">
        Header set Cache-Control "max-age=31536000, public"
    </filesMatch>

    # One month for JavaScript and PDF files
    <filesMatch ".(js|pdf)$">
        Header set Cache-Control "max-age=2592000, public"
    </filesMatch>

    # One week for CSS files
    <filesMatch ".(css)$">
        Header set Cache-Control "max-age=604800, public"
    </filesMatch>
</ifModule>
image

nginx cache

/etc/nginx/sites-available/default

# Expires map
map $sent_http_content_type $expires {
    default                    off;
    text/html                  epoch;
    text/css                   max;
    application/javascript     max;
    ~image/                    max;
}

server {
    listen 80 default_server;
    listen [::]:80 default_server;

    expires $expires;
image
  • When DevTools is open, it defaults to Disable cache
  • Not realistic to what users will actually experience
    width:700px
image

Cache Busting

  • Lets you use long cache periods and still change files

src="image.png"

src="image.png?20210403"
src="image.png?v1"

image

Wordpress: Wp Super Cache

A very easy to use caching solution. This improves php load time, it doesn't minify css or change image formats.

width:500px

image

PageSpeed Modules

https://www.modpagespeed.com/

  • Module that loads into Apache or Nginx and best-effort improves site performance automatically
    • css
    • images
    • minify / compresses
image

Next Gen Image Formats

Original is 2044x3840 pixels

  • gif 6.4MB
  • jpg 1.8MB
  • png 12.8MB
  • webp 7.9MB
image

Loss in Compression

  • Lossy slightly changes data to get better compression (JPG)
  • Lossless is an exact copy (PNG)
  • Vector resizable polygons to any size (SVG)
image

Webp

  • Released Sept 2010 by Google
  • A next-gen Lossy and Losseless compression
  • ~25% smaller than PNG/JPG

brew install webp
cwebp

image
cwebp bestbuycom-desktop.png -q 80 -o bestbuycom-desktop.webp
  Saving file 'bestbuycom-desktop.webp'
  File:      bestbuycom-desktop.png
  Dimension: 3810 x 1894
  Output:    225252 bytes Y-U-V-All-PSNR 45.38 47.14 47.58   45.94 dB
             (0.25 bpp)
  block count:  intra4:       5514  (19.39%)
                intra16:     22927  (80.61%)
                skipped:     19952  (70.15%)
  bytes used:  header:            538  (0.2%)
               mode-partition:  35639  (15.8%)
   Residuals bytes  |segment 1|segment 2|segment 3|segment 4|  total
      macroblocks:  |       1%|       5%|      15%|      79%|   28441
        quantizer:  |      36 |      35 |      30 |      24 |
     filter level:  |      11 |       7 |      63 |      37 |
1.6M  bestbuycom-desktop.png
419K  bestbuycom-desktop.jpg
220K  bestbuycom-desktop.webp
image

Image Compression deep-dive

width:800px
https://www.youtube.com/watch?v=F1kYBnY6mwg

image

Wordpress: WebP Converter for Media

  • Auto converts JPG/PNG to WebP

  • Uses .htaccess to redirect .jpg/.png to a php file to decide what to serve

  • Requires a gd library with webp support

  • Most plugins use remote conversion and a limit/cost per image

image

width:700px

image

Image Resizing CDNs

  • Some let you place your full size image on your server
  • Use the CDN url which auto resizes
<img src="https://ik.imagekit.io/ikmedia/building.jpg" 
     srcset="https://ik.imagekit.io/ikmedia/building.jpeg?tr=w-300 300w,
             https://ik.imagekit.io/ikmedia/building.jpeg?tr=w-600 600w,
             https://ik.imagekit.io/ikmedia/building.jpeg?tr=w-900 900w"
/>
image

Activity

Find assets on your own website that can be improved

image

Last Break

Almost made it to 4.30pm...

When you return we will wrap up with CI/automations

image

CI / Automations

image

Statuscake - Page Speed Monitoring

  • Free version will check 1 webpage per day
  • Can set alerts if load time or file size goes over a set level
  • Can throttle connection to simulate mobile
image

width:1000px

image

Start Monitoring your site

https://statuscake.com

image

lhci

npm install -g @lhci/cli

The goal is you only use this command:
lhci autorun

But really it is running these:
lhci collect --url https://pixotech.com
lhci open
upload --target lhci --token 2348-3829 --serverBaseURL https://example.com

image

image

image

https://lighthouse-ci.pixodev.net

To start your own server:

docker volume create lhci-data
docker container run --publish 9001:9001 --mount='source=lhci-data,target=/data' --detach patrickhulce/lhci-server
image

Creating a new project

lhci wizard

new-project
? What is the URL of your LHCI server? https://username:password@lighthouse-ci.pixodev.net
? What would you like to name the project? basic-auth-test
? Where is the project's code hosted? nowhere
? What branch is considered the repo's trunk or main branch? main

Created project basic-auth-test (5a4060d1-f122-422f-80b8-5d6e74926965)!
Use build token b54c8ac2-123-123-123-ff3c04e988e0 to add data.
Use admin token KkGbJNDbEqLsdfsvWilLKdlmG2sY5Il5cocyKEgR to manage data. KEEP THIS SECRET!

PLEASE save both tokens somewhere

image

When to use lhci instead of lighthouse

  • You want automated runs of lighthouse with a config file running the entire process
  • You can still script lighthouse
  • You want to upload to a particular destination
image

.lighthouserc.json in the root directory (or .yaml or .js)

{
  "ci": {
    "collect": {
       "url": ["https://pixotech.com/"],
       "numberOfRuns": 3
    },
    "assert": {
       "preset": "lighthouse:all" ,
       "budgetFile": "budget.json"
    },
    "upload": {
      "target": "lhci",
      "token": "56d601b2-342a-1234-1234-9ae4f8721e9e",
      "serverBaseUrl": "https://pixo:pixo@lighthouse-ci.pixodev.net/"
    }
  }
}
image

Getting started with lhci

FOLDER_NAME=steve-zazeski-com-lighthouse

mkdir ${FOLDER_NAME}
cd ${FOLDER_NAME}
git init
git branch daily-test && git checkout daily-test
vi .lighthouserc.json

git commit --allow-empty -m "Run for `date -u +%Y.%m.%d-%H.%M`"
lhci autorun

configuration

image

Lighthouse with Jenkins

If the executor has chrome, lighthouse, lhci installed:

lhci autorun

If you are using a docker node and give it the .lighthouserc.json

docker container run --cap-add=SYS_ADMIN --rm \
  --cpus="1" --shm-size=2g \
  -v "$(pwd)/lhci-data:/home/lhci/reports/.lighthouseci" \
  patrickhulce/lhci-client \
  lhci autorun
image

add .github/workflows/audit.yml file with:

name: Performance Audit
on: [pull_request]
jobs:
  build:
    runs-on: ubuntu-latest
    steps:
      - uses: actions/checkout@v1
      - name: Use Node.js 12.x
        uses: actions/setup-node@v1
        with:
          node-version: 12.x
      - name: Install
        run: |
          npm ci
      - name: Build
        run: |
          npm run build
      - name: Run Lighthouse CI
        run: |
          npm install -g @lhci/cli@0.3.x
          lhci autorun
image

DNS

image

Check your site

  • Penalty you pay on first load of each sub/domain
  • Fast sites lookup in ~20ms
  • Normal sites lookup less than ~100ms

dig pixotech.com mac linux
nslookup -debug pixotech.com win

; <<>> DiG 9.10.6 <<>> pixotech.com
;pixotech.com.			IN	A
pixotech.com.		77	IN	A	52.34.48.14
;; Query time: 82 msec
image
$ httpstat steve.zazeski.com

Connected to 3.13.92.225:80 from 192.168.1.194:41286
HTTP/1.1 301 Moved Permanently
Server: openresty
Date: Mon, 12 Apr 2021 23:30:21 GMT
Content-Type: text/html
Content-Length: 166
Connection: keep-alive
Location: https://steve.zazeski.com/
Strict-Transport-Security: max-age=63072000;includeSubDomains; preload
X-Served-By: steve.zazeski.com

Body stored in: /tmp/tmpxaqmzk5i

  DNS Lookup   TCP Connection   Server Processing   Content Transfer
[    73ms    |      25ms      |       35ms        |        1ms       ]
             |                |                   |                  |
    namelookup:73ms           |                   |                  |
                        connect:98ms              |                  |
                                      starttransfer:133ms            |
                                                                 total:134ms
image

DNS - CNAMES

  • All DNS queries recurse until they end in A / AAAA record
build.pixotech.com.	299	IN	CNAME	on-premise-docker-swarm.pixodev.net.
on-premise-docker-swarm.pixodev.net. 59	IN CNAME icarus.pixodev.net.
icarus.pixodev.net.	59	IN	A	173.167.185.184

;; Query time: 219 msec
image

Fastest DNS Resolution

image

Mobile Testing

  • Simulated CPU and Network slowdowns
    width:500px
image

Real Mobile Testing

https://webpagetest.org/
width:500px

image

scrcpy (screen copy)

image

DevTools on Mobile Devices

  1. Connect phone via USB
  2. Enable Developer Mode on the phone ()
  3. Authorize debugging (will reprompt in 14 days)
  4. Goto chrome:\inspect on your desktop chrome
  5. Click inspect on the tab you want to open devtools on
image

width:900px

image

PWA

Progressive web apps are coming with moderate support on iOS and Android.

  • JS code that can run offline through service workers
  • Cache layer for offline
  • Be careful with service workers updating (create-react-app)
image

Critical Path CSS

  • Fix for layout shift

https://jonassebastianohlsson.com/criticalpathcssgenerator/
https://criticalcss.com

yarn add --dev penthouse

image

width:1000px

image

Recap

image
  • lighthouse checks via online, devtools, cli or ci
  • Look at the waterfall for bottlenecks
  • Enable Server Caching
  • Enable Server Compression (gzip or brotli)
  • Use monitoring (statuscake)
  • Test your site with load before someone else does
  • Fix just the worse thing at the moment, then repeat
  • Don't let best get in the way of better
image